الحلقات 26

1

Sculpture Studio Extension - Floor

0%
فبراير 6, 201030m

The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

2

Sculpture Studio Extension - Walls

0%
فبراير 13, 201030m

The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

3

Sculpture Studio Extension - Wrap Up

0%
فبراير 20, 201030m

The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

4

Stone Cottage – Cul-De-Sac Prep

0%
فبراير 27, 201030m

The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

5

Stone Cottage – Concrete & Foam

0%
مارس 6, 201030m

The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

6

Stone Cottage – Instant House

0%
مارس 13, 201030m

The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

7

Stone Cottage – Roofscape

0%
مارس 20, 201030m

The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

8

Stone Cottage – Windows

0%
مارس 27, 201030m

The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

9

Stone Cottage – Concrete Floors

0%
أبريل 3, 201030m

The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

10

Stone Cottage – Inner Workings

0%
أبريل 10, 201030m

The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

11

Stone Cottage – Insulation

0%
أبريل 17, 201030m

The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

اقرأ أكثر

فريق العمل 0

إخراج: لم يتم إضافة أي مخرج.

سيناريو: لم يتم إضافة أي كاتب.

ضيوف الشرف 0 كل الممثلين و فريق العمل

لم يتم إضافة أي ضيف شرف.

صور الحلقة 0 عرض كل صور الحلقة

لم يتم إضافة أي صور للحلقة.

You need to be logged in to continue. Click here to login or here to sign up.

12

Stone Cottage – Geothermal

0%
أبريل 24, 201030m

The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

13

His and Her Garage

0%
سبتمبر 11, 201030m

The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

14

Stone Cottage -- Interior Walls

0%
سبتمبر 18, 201030m

After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

15

Stone Cottage -- Vaulted Ceilings

0%
سبتمبر 25, 201030m

The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

16

Stone Cottage -- Millwork

0%
أكتوبر 2, 201030m

Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

17

Stone Cottage -- Exterior Doors

0%
أكتوبر 9, 201030m

The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

18

Stone Cottage -- Tile

0%
أكتوبر 16, 201030m

The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

19

Stone Cottage -- Driveway

0%
أكتوبر 23, 201030m

The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

20

Stone Cottage -- Interior Doors

0%
أكتوبر 30, 201030m

The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

21

Stone Cottage -- Laundry Room

0%
نوفمبر 6, 201030m

The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

22

Stone Cottage -- Office

0%
نوفمبر 13, 201030m

The home office begins to take shape, as the custom staircase work begins.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

23

Stone Cottage -- Countertops

0%
نوفمبر 20, 201030m

The stone countertops are fabricated and installed.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

24

Stone Cottage -- Fixtures and Appliances

0%
نوفمبر 27, 201030m

The Hometime crew installs cabinets, countertops and landscaping.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

25

Stone Cottage -- Retractable Screens

0%
يناير 22, 201130m

The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

26

Stone Cottage -- Sod and Stone

0%
Season Finale
يناير 29, 201130m

The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

العودة إلى الأعلى

You need to be logged in to continue. Click here to login or here to sign up.

لم تجد الفلم أو المسلسل ؟ سجل دخولك و انشئها

عام

s ركز شريط البحث
p افتح قائمة الملف الشخصي
esc اغلق النافذة المفتوحة
? افتح نافذة اختصارات لوحة المفاتيح

على كافة صفحات الوسائط

b ارجع للخلف (او للصفحة الام عند التطبيق)
e انتقل لصفحة التعديل

على كافة صفحات موسم المسلسل

(السهم الايمن) انتقل للموسم التالي
(السهم الايسر) انتقل للموسم السابق

على كافة صفحات حلقة المسلسل

(السهم الايمن) انتقل للحلقة التالية
(السهم الايسر) انتقل للحلقة السابقة

على كافة صفحات الصور

a افتح صفحة اضافة الصورة

على كافة صفحات التعديل

t افتح محدد الترجمة
ctrl+ s ارسال النموذج

على صفحات المناقشة

n انشى نقاش جديد
w تبديل حالة المتابعة
p تبديل عام / خاص
c تبديل اغلاق / فتح
a افتح الانشطة
r رد على النقاش
l انتقل لأخر رد
ctrl+ enter أرسل رسالتك
(السهم الايمن) الصفحة التالية
(السهم الايسر) الصفحة السابقة

الاعدادات

هل تريد تقييم او اضافة هذا العنصر للقائمة؟

تسجيل الدخول