集 26
Sculpture Studio Extension - Floor
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
展开Sculpture Studio Extension - Walls
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
展开Sculpture Studio Extension - Wrap Up
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
展开Stone Cottage – Cul-De-Sac Prep
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
展开Stone Cottage – Concrete & Foam
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
展开Stone Cottage – Instant House
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
展开Stone Cottage – Roofscape
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
展开Stone Cottage – Windows
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
展开Stone Cottage – Concrete Floors
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
展开Stone Cottage – Inner Workings
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
展开Stone Cottage – Insulation
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
展开Stone Cottage – Geothermal
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
展开His and Her Garage
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
展开Stone Cottage -- Interior Walls
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
展开Stone Cottage -- Vaulted Ceilings
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
展开Stone Cottage -- Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
展开Stone Cottage -- Exterior Doors
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
展开Stone Cottage -- Tile
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
展开Stone Cottage -- Driveway
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
展开Stone Cottage -- Interior Doors
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
展开Stone Cottage -- Laundry Room
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
展开Stone Cottage -- Office
The home office begins to take shape, as the custom staircase work begins.
展开Stone Cottage -- Countertops
The stone countertops are fabricated and installed.
展开Stone Cottage -- Fixtures and Appliances
The Hometime crew installs cabinets, countertops and landscaping.
展开Stone Cottage -- Retractable Screens
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
展开Stone Cottage -- Sod and Stone
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
展开