26

1

Sculpture Studio Extension - Floor

0%
2010 年 02 月 06 日30m

The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

展开

You need to be logged in to continue. Click here to login or here to sign up.

2

Sculpture Studio Extension - Walls

0%
2010 年 02 月 13 日30m

The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

展开

You need to be logged in to continue. Click here to login or here to sign up.

3

Sculpture Studio Extension - Wrap Up

0%
2010 年 02 月 20 日30m

The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

展开

You need to be logged in to continue. Click here to login or here to sign up.

4

Stone Cottage – Cul-De-Sac Prep

0%
2010 年 02 月 27 日30m

The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

展开

You need to be logged in to continue. Click here to login or here to sign up.

5

Stone Cottage – Concrete & Foam

0%
2010 年 03 月 06 日30m

The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

展开

You need to be logged in to continue. Click here to login or here to sign up.

6

Stone Cottage – Instant House

0%
2010 年 03 月 13 日30m

The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

展开

You need to be logged in to continue. Click here to login or here to sign up.

7

Stone Cottage – Roofscape

0%
2010 年 03 月 20 日30m

The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

展开

工作人员 0

导演者: 未添加导演。

原作: 未添加作者。

客串演员 0 完整演职员表

未添加客串演员。

本集图片 0 查看全部本集图片

未添加本集图片。

You need to be logged in to continue. Click here to login or here to sign up.

8

Stone Cottage – Windows

0%
2010 年 03 月 27 日30m

The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

展开

You need to be logged in to continue. Click here to login or here to sign up.

9

Stone Cottage – Concrete Floors

0%
2010 年 04 月 03 日30m

The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

展开

You need to be logged in to continue. Click here to login or here to sign up.

10

Stone Cottage – Inner Workings

0%
2010 年 04 月 10 日30m

The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

展开

You need to be logged in to continue. Click here to login or here to sign up.

11

Stone Cottage – Insulation

0%
2010 年 04 月 17 日30m

The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

展开

You need to be logged in to continue. Click here to login or here to sign up.

12

Stone Cottage – Geothermal

0%
2010 年 04 月 24 日30m

The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

展开

You need to be logged in to continue. Click here to login or here to sign up.

13

His and Her Garage

0%
2010 年 09 月 11 日30m

The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

展开

You need to be logged in to continue. Click here to login or here to sign up.

14

Stone Cottage -- Interior Walls

0%
2010 年 09 月 18 日30m

After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

展开

You need to be logged in to continue. Click here to login or here to sign up.

15

Stone Cottage -- Vaulted Ceilings

0%
2010 年 09 月 25 日30m

The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

展开

You need to be logged in to continue. Click here to login or here to sign up.

16

Stone Cottage -- Millwork

0%
2010 年 10 月 02 日30m

Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

展开

You need to be logged in to continue. Click here to login or here to sign up.

17

Stone Cottage -- Exterior Doors

0%
2010 年 10 月 09 日30m

The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

展开

You need to be logged in to continue. Click here to login or here to sign up.

18

Stone Cottage -- Tile

0%
2010 年 10 月 16 日30m

The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

展开

You need to be logged in to continue. Click here to login or here to sign up.

19

Stone Cottage -- Driveway

0%
2010 年 10 月 23 日30m

The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

展开

You need to be logged in to continue. Click here to login or here to sign up.

20

Stone Cottage -- Interior Doors

0%
2010 年 10 月 30 日30m

The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

展开

You need to be logged in to continue. Click here to login or here to sign up.

21

Stone Cottage -- Laundry Room

0%
2010 年 11 月 06 日30m

The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

展开

You need to be logged in to continue. Click here to login or here to sign up.

22

Stone Cottage -- Office

0%
2010 年 11 月 13 日30m

The home office begins to take shape, as the custom staircase work begins.

展开

You need to be logged in to continue. Click here to login or here to sign up.

23

Stone Cottage -- Countertops

0%
2010 年 11 月 20 日30m

The stone countertops are fabricated and installed.

展开

You need to be logged in to continue. Click here to login or here to sign up.

24

Stone Cottage -- Fixtures and Appliances

0%
2010 年 11 月 27 日30m

The Hometime crew installs cabinets, countertops and landscaping.

展开

You need to be logged in to continue. Click here to login or here to sign up.

25

Stone Cottage -- Retractable Screens

0%
2011 年 01 月 22 日30m

The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

展开

You need to be logged in to continue. Click here to login or here to sign up.

26

Stone Cottage -- Sod and Stone

0%
Season Finale
2011 年 01 月 29 日30m

The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

展开

You need to be logged in to continue. Click here to login or here to sign up.

回到顶部

You need to be logged in to continue. Click here to login or here to sign up.

找不到电影或剧集?登录并创建它吧。

全站通用

s 聚焦到搜索栏
p 打开个人资料菜单
esc 关闭打开的窗口
? 打开键盘快捷键窗口

在媒体页面

b 返回(或返回上级)
e 进入编辑页面

在电视季页面

(右箭头)下一季
(左箭头)前一季

在电视集页面

(右箭头)下一集
(左箭头)前一集

在所有图像页面

a 打开添加图片窗口

在所有编辑页面

t 打开翻译选择器
ctrl+ s 提交

在讨论页面

n 创建新讨论
w 切换关注状态
p 设为公开 / 私密讨论
c 关闭 / 开放讨论
a 打开活动页
r 回复讨论
l 跳转至最新回复
ctrl+ enter 发送信息
(右箭头)下一页
(左箭头)前一页

设置

想给这个条目评分或将其添加到片单中?

登录

还不是会员?

注册加入社区