Episodes 26

1

Exterior Harmony: Doors and Stone

0%
February 4, 201230m

The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.

Read More

Crew 0

Directed by: No director has been added.

Written by: No writer has been added.

Guest Stars 0 Full Cast & Crew

No guest stars have been added.

Episode Images 0 View All Episode Images

No episode images have been added.

You need to be logged in to continue. Click here to login or here to sign up.

2

Exterior Harmony: Driveway and Walkway

0%
February 11, 201230m

Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

3

Kitchen and Mud Room Remodel 1

0%
March 3, 201230m

Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

4

Kitchen and Mud Room Remodel 2

0%
March 10, 201230m

Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

5

Kitchen and Mud Room Remodel 3

0%
March 17, 201230m

Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

6

Kitchen and Mud Room Remodel 4

0%
March 24, 201230m

Dean and Miriam show how to blend two different finishes as they install new cabinets.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

7

Kitchen and Mud Room Remodel 5

0%
March 31, 201230m

Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

8

Kitchen and Mud Room Remodel 6

0%
April 7, 201230m

It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

9

Kitchen and Mud Room Remodel 7

0%
April 14, 201230m

Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

10

Front Entry Curb Appeal

0%
April 21, 201230m

Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

11

Screen Porch Highlights

0%
April 28, 201230m

Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

12

Homes for a Home Show

0%
May 5, 201230m

Dean and Miriam document the construction of two new homes, built inside a home and garden show.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

13

Quartz Kitchen Remodel

0%
May 12, 201230m

Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

14

Exterior Harmony: Landscape Wrap

0%
October 6, 201230m

Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

15

North Woods Trees

0%
October 13, 201230m

Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

16

Timber Shed Wall Framing

0%
October 20, 201230m

Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

17

Timber Shed Roof Framing

0%
October 27, 201230m

Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

18

Stamped Concrete Patio Demo

0%
November 3, 201230m

Taking out old concrete to repair, reframe and reseal the patio over a storage area.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

19

Stamped Concrete Patio Re-Poured

0%
November 10, 201230m

Re-pouring and re-stamping the concrete patio while fixing up the storage area below.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

20

Built-In Gas Grill

0%
November 17, 201230m

Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

21

Island Kitchen 2.0: Cabinets

0%
November 24, 201230m

Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

22

Island Kitchen 2.0: Countertops

0%
December 1, 201230m

Finishing up the new cabinets for the island kitchen and covering those with new countertops.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

23

Island Kitchen 2.0: Appliances

0%
December 8, 201230m

Installing lights, plumbing fixtures and appliances.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

24

Timber Shed Doors

0%
December 15, 201230m

Installing custom carriage house doors and laying a system of tailored pavers.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

25

Timber Shed Roof and Stone

0%
December 22, 201230m

Installing clay tile roofing and natural stone cladding for the walls.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

26

Timber Shed Finishing Touches

0%
Season Finale
December 29, 201230m

Finishing up the exterior and getting the new shed ready for winter.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

Back to top

You need to be logged in to continue. Click here to login or here to sign up.

Can't find a movie or TV show? Login to create it.

Global

s focus the search bar
p open profile menu
esc close an open window
? open keyboard shortcut window

On media pages

b go back (or to parent when applicable)
e go to edit page

On TV season pages

(right arrow) go to next season
(left arrow) go to previous season

On TV episode pages

(right arrow) go to next episode
(left arrow) go to previous episode

On all image pages

a open add image window

On all edit pages

t open translation selector
ctrl+ s submit form

On discussion pages

n create new discussion
w toggle watching status
p toggle public/private
c toggle close/open
a open activity
r reply to discussion
l go to last reply
ctrl+ enter submit your message
(right arrow) next page
(left arrow) previous page

Settings

Want to rate or add this item to a list?

Login