Epizode 26

1

Exterior Harmony: Doors and Stone

0%
4 veljača 201230m

The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

2

Exterior Harmony: Driveway and Walkway

0%
11 veljača 201230m

Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

3

Kitchen and Mud Room Remodel 1

0%
3 ožujak 201230m

Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

4

Kitchen and Mud Room Remodel 2

0%
10 ožujak 201230m

Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

5

Kitchen and Mud Room Remodel 3

0%
17 ožujak 201230m

Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

6

Kitchen and Mud Room Remodel 4

0%
24 ožujak 201230m

Dean and Miriam show how to blend two different finishes as they install new cabinets.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

7

Kitchen and Mud Room Remodel 5

0%
31 ožujak 201230m

Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

8

Kitchen and Mud Room Remodel 6

0%
7 travanj 201230m

It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

9

Kitchen and Mud Room Remodel 7

0%
14 travanj 201230m

Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

10

Front Entry Curb Appeal

0%
21 travanj 201230m

Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

11

Screen Porch Highlights

0%
28 travanj 201230m

Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

12

Homes for a Home Show

0%
5 svibanj 201230m

Dean and Miriam document the construction of two new homes, built inside a home and garden show.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

13

Quartz Kitchen Remodel

0%
12 svibanj 201230m

Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.

Pročitaj više

Ekipa 0

Redatelj: Redatelj nije dodan.

Scenaristi: Pisac nije dodan.

Gostujuće zvijezde 0 Kompletna postava i ekipa

No guest stars have been added.

Slike epizoda 0 Pogledaj sve slike epizoda

No episode images have been added.

You need to be logged in to continue. Click here to login or here to sign up.

14

Exterior Harmony: Landscape Wrap

0%
6 listopad 201230m

Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

15

North Woods Trees

0%
13 listopad 201230m

Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

16

Timber Shed Wall Framing

0%
20 listopad 201230m

Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

17

Timber Shed Roof Framing

0%
27 listopad 201230m

Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

18

Stamped Concrete Patio Demo

0%
3 studeni 201230m

Taking out old concrete to repair, reframe and reseal the patio over a storage area.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

19

Stamped Concrete Patio Re-Poured

0%
10 studeni 201230m

Re-pouring and re-stamping the concrete patio while fixing up the storage area below.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

20

Built-In Gas Grill

0%
17 studeni 201230m

Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

21

Island Kitchen 2.0: Cabinets

0%
24 studeni 201230m

Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

22

Island Kitchen 2.0: Countertops

0%
1 prosinac 201230m

Finishing up the new cabinets for the island kitchen and covering those with new countertops.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

23

Island Kitchen 2.0: Appliances

0%
8 prosinac 201230m

Installing lights, plumbing fixtures and appliances.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

24

Timber Shed Doors

0%
15 prosinac 201230m

Installing custom carriage house doors and laying a system of tailored pavers.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

25

Timber Shed Roof and Stone

0%
22 prosinac 201230m

Installing clay tile roofing and natural stone cladding for the walls.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

26

Timber Shed Finishing Touches

0%
Season Finale
29 prosinac 201230m

Finishing up the exterior and getting the new shed ready for winter.

Pročitaj više

You need to be logged in to continue. Click here to login or here to sign up.

Povratak na vrh

You need to be logged in to continue. Click here to login or here to sign up.

Ne možete pronaći film ili TV seriju? prijavite se da biste ga napravili.

Global

s focus the search bar
p otvorite izbornik profila
esc zatvori otvoreni prozor
? open keyboard shortcut window

On media pages

b go back (or to parent when applicable)
e go to edit page

On TV season pages

(desna strelica) idi na sljedeću sezonu
(left arrow) go to previous season

On TV episode pages

(desna strelica) idi na sljedeću epizodu
(left arrow) go to previous episode

On all image pages

a open add image window

On all edit pages

t open translation selector
ctrl+ s submit form

On discussion pages

n create new discussion
w toggle watching status
p toggle public/private
c toggle close/open
a otvori aktivnost
r reply to discussion
l go to last reply
ctrl+ enter submit your message
(desna strelica) sljedeća stranica
(left arrow) previous page

Postavke

Want to rate or add this item to a list?

Prijavi se