الحلقات 26

1

Exterior Harmony: Doors and Stone

0%
فبراير 4, 201230m

The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

2

Exterior Harmony: Driveway and Walkway

0%
فبراير 11, 201230m

Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

3

Kitchen and Mud Room Remodel 1

0%
مارس 3, 201230m

Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

4

Kitchen and Mud Room Remodel 2

0%
مارس 10, 201230m

Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

5

Kitchen and Mud Room Remodel 3

0%
مارس 17, 201230m

Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

6

Kitchen and Mud Room Remodel 4

0%
مارس 24, 201230m

Dean and Miriam show how to blend two different finishes as they install new cabinets.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

7

Kitchen and Mud Room Remodel 5

0%
مارس 31, 201230m

Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

8

Kitchen and Mud Room Remodel 6

0%
أبريل 7, 201230m

It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

9

Kitchen and Mud Room Remodel 7

0%
أبريل 14, 201230m

Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

10

Front Entry Curb Appeal

0%
أبريل 21, 201230m

Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

11

Screen Porch Highlights

0%
أبريل 28, 201230m

Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

12

Homes for a Home Show

0%
مايو 5, 201230m

Dean and Miriam document the construction of two new homes, built inside a home and garden show.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

13

Quartz Kitchen Remodel

0%
مايو 12, 201230m

Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

14

Exterior Harmony: Landscape Wrap

0%
أكتوبر 6, 201230m

Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

15

North Woods Trees

0%
أكتوبر 13, 201230m

Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

16

Timber Shed Wall Framing

0%
أكتوبر 20, 201230m

Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

17

Timber Shed Roof Framing

0%
أكتوبر 27, 201230m

Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

18

Stamped Concrete Patio Demo

0%
نوفمبر 3, 201230m

Taking out old concrete to repair, reframe and reseal the patio over a storage area.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

19

Stamped Concrete Patio Re-Poured

0%
نوفمبر 10, 201230m

Re-pouring and re-stamping the concrete patio while fixing up the storage area below.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

20

Built-In Gas Grill

0%
نوفمبر 17, 201230m

Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

21

Island Kitchen 2.0: Cabinets

0%
نوفمبر 24, 201230m

Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

22

Island Kitchen 2.0: Countertops

0%
ديسمبر 1, 201230m

Finishing up the new cabinets for the island kitchen and covering those with new countertops.

اقرأ أكثر

فريق العمل 0

إخراج: لم يتم إضافة أي مخرج.

سيناريو: لم يتم إضافة أي كاتب.

ضيوف الشرف 0 كل الممثلين و فريق العمل

لم يتم إضافة أي ضيف شرف.

صور الحلقة 0 عرض كل صور الحلقة

لم يتم إضافة أي صور للحلقة.

You need to be logged in to continue. Click here to login or here to sign up.

23

Island Kitchen 2.0: Appliances

0%
ديسمبر 8, 201230m

Installing lights, plumbing fixtures and appliances.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

24

Timber Shed Doors

0%
ديسمبر 15, 201230m

Installing custom carriage house doors and laying a system of tailored pavers.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

25

Timber Shed Roof and Stone

0%
ديسمبر 22, 201230m

Installing clay tile roofing and natural stone cladding for the walls.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

26

Timber Shed Finishing Touches

0%
Season Finale
ديسمبر 29, 201230m

Finishing up the exterior and getting the new shed ready for winter.

اقرأ أكثر

You need to be logged in to continue. Click here to login or here to sign up.

العودة إلى الأعلى

You need to be logged in to continue. Click here to login or here to sign up.

لم تجد الفلم أو المسلسل ؟ سجل دخولك و انشئها

عام

s ركز شريط البحث
p افتح قائمة الملف الشخصي
esc اغلق النافذة المفتوحة
? افتح نافذة اختصارات لوحة المفاتيح

على كافة صفحات الوسائط

b ارجع للخلف (او للصفحة الام عند التطبيق)
e انتقل لصفحة التعديل

على كافة صفحات موسم المسلسل

(السهم الايمن) انتقل للموسم التالي
(السهم الايسر) انتقل للموسم السابق

على كافة صفحات حلقة المسلسل

(السهم الايمن) انتقل للحلقة التالية
(السهم الايسر) انتقل للحلقة السابقة

على كافة صفحات الصور

a افتح صفحة اضافة الصورة

على كافة صفحات التعديل

t افتح محدد الترجمة
ctrl+ s ارسال النموذج

على صفحات المناقشة

n انشى نقاش جديد
w تبديل حالة المتابعة
p تبديل عام / خاص
c تبديل اغلاق / فتح
a افتح الانشطة
r رد على النقاش
l انتقل لأخر رد
ctrl+ enter أرسل رسالتك
(السهم الايمن) الصفحة التالية
(السهم الايسر) الصفحة السابقة

الاعدادات

هل تريد تقييم او اضافة هذا العنصر للقائمة؟

تسجيل الدخول