Episoade 26

1

Exterior Harmony: Doors and Stone

0%
4 februarie 201230m

The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

2

Exterior Harmony: Driveway and Walkway

0%
11 februarie 201230m

Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.

Citiți mai multe

Echipă filmare 0

Regizat de: Nu a fost adăugat niciun regizor.

Scris de: Nu a fost adăugat niciun scriitor.

Vedete oaspeți 0 Distribuție și echipă filmare completă

Nu a fost adăugată nicio vedetă oaspete

Nu a fost adăugată nicio imagine pentru episoade.

You need to be logged in to continue. Click here to login or here to sign up.

3

Kitchen and Mud Room Remodel 1

0%
3 martie 201230m

Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

4

Kitchen and Mud Room Remodel 2

0%
10 martie 201230m

Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

5

Kitchen and Mud Room Remodel 3

0%
17 martie 201230m

Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

6

Kitchen and Mud Room Remodel 4

0%
24 martie 201230m

Dean and Miriam show how to blend two different finishes as they install new cabinets.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

7

Kitchen and Mud Room Remodel 5

0%
31 martie 201230m

Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

8

Kitchen and Mud Room Remodel 6

0%
7 aprilie 201230m

It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

9

Kitchen and Mud Room Remodel 7

0%
14 aprilie 201230m

Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

10

Front Entry Curb Appeal

0%
21 aprilie 201230m

Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

11

Screen Porch Highlights

0%
28 aprilie 201230m

Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

12

Homes for a Home Show

0%
5 mai 201230m

Dean and Miriam document the construction of two new homes, built inside a home and garden show.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

13

Quartz Kitchen Remodel

0%
12 mai 201230m

Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

14

Exterior Harmony: Landscape Wrap

0%
6 octombrie 201230m

Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

15

North Woods Trees

0%
13 octombrie 201230m

Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

16

Timber Shed Wall Framing

0%
20 octombrie 201230m

Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

17

Timber Shed Roof Framing

0%
27 octombrie 201230m

Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

18

Stamped Concrete Patio Demo

0%
3 noiembrie 201230m

Taking out old concrete to repair, reframe and reseal the patio over a storage area.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

19

Stamped Concrete Patio Re-Poured

0%
10 noiembrie 201230m

Re-pouring and re-stamping the concrete patio while fixing up the storage area below.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

20

Built-In Gas Grill

0%
17 noiembrie 201230m

Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

21

Island Kitchen 2.0: Cabinets

0%
24 noiembrie 201230m

Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

22

Island Kitchen 2.0: Countertops

0%
1 decembrie 201230m

Finishing up the new cabinets for the island kitchen and covering those with new countertops.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

23

Island Kitchen 2.0: Appliances

0%
8 decembrie 201230m

Installing lights, plumbing fixtures and appliances.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

24

Timber Shed Doors

0%
15 decembrie 201230m

Installing custom carriage house doors and laying a system of tailored pavers.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

25

Timber Shed Roof and Stone

0%
22 decembrie 201230m

Installing clay tile roofing and natural stone cladding for the walls.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

26

Timber Shed Finishing Touches

0%
Season Finale
29 decembrie 201230m

Finishing up the exterior and getting the new shed ready for winter.

Citiți mai multe

You need to be logged in to continue. Click here to login or here to sign up.

Înapoi sus

You need to be logged in to continue. Click here to login or here to sign up.

Nu găsiți un film sau un serial? Autentificați-vă pentru a-l crea.

Global

s focalizați bara de căutare
p deschideți meniul profilului
esc închide o fereastră deschisă
? deschideți fereastra de scurtături de la tastatură

Pe paginile media

b înapoi (sau la pornire atunci când este cazul)
e accesați pagina de editare

Pe paginile sezonului TV

(săgeată dreapta) mergeți la sezonul următor
(săgeată stânga) mergeți la sezonul precedent

Pe paginile episoadelor TV

(săgeată dreapta) mergeți la următorul episod
(săgeată stânga) mergeți la episodul anterior

Pe toate paginile de imagini

a deschideți fereastra pentru adăugarea imaginii

Pe toate paginile de editare

t deschide selectorul de traduceri
ctrl+ s trimiteți formularul

Pe paginile de discuții

n creați o nouă discuție
w comutați stare de vizionare
p comutați public/privat
c comutați închidere/deschidere
a deschide activitatea
r răspuns la discuție
l mergeți la ultimul răspuns
ctrl+ enter trimiteți mesajul
(săgeată dreapta) pagina următoare
(săgeată stânga) pagina anterioară

Setări

Doriți să evaluați sau să adăugați acest element într-o listă?

Autentificare